Every job below is one we do ourselves across Binghamton.
We set footings below the 42-inch frost line used in this part of New York, so the deck doesn't heave when the ground freezes. Joists go in at 16 inches on center, and the ledger board gets through-bolted and flashed to keep water from working its way into your rim joist.
Soft spots in the decking usually mean the board underneath is holding water, not that the whole frame is bad. We replace what's rotted, sister cracked joists, and tighten up railings before they turn into a liability.
We pressure wash and sand first, because stain doesn't hold on top of old mildew and graying wood. Depending on sun exposure and foot traffic, most decks around here need a fresh coat every two to three years to keep winter moisture out of the grain.
Some decks need to wrap around a hot tub, step down to a lower patio, or tuck a bench into the railing line. We'll draw it out, account for New York's snow load requirements, and build to match the roofline of your house instead of bolting on something generic.
Composite boards like Trex or TimberTech don't need staining and won't splinter underfoot. We install them with hidden fastener clips for a clean surface, and leave the gap manufacturers call for so the boards can expand in summer heat without buckling.
Code calls for balusters spaced so a 4-inch sphere can't pass through, and we build to that whether it's wood, aluminum, or cable rail. Loose posts are almost always a sign the concrete footing underneath has shifted, and that's what we actually fix.
If the frame underneath is still solid, you don't need a whole new deck. We pull the old decking, check every joist while it's exposed, and lay new boards with the right gap spacing so water sheds instead of pooling.
Old decks come down board by board, with nails and screws pulled instead of left in the lumber pile. We haul everything off, including the ledger board if it's getting replaced, so the site is clear for whatever comes next.
A lot of homeowners want part of the deck open and part of it screened in off the bugs. We tie the roof framing into the house correctly and build the screen panels separate from the open deck rail, so each section does its job.
Concrete footings crack or heave, posts rot where they meet the ground, and joists sag under years of snow load. We dig out and replace footings below frost depth, swap rotted posts, and sister joists that are still structurally sound but starting to bow.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
We quote deck work throughout this part of New York, not just inside Binghamton city limits.
Questions that come up once a deck project is actually underway.
Describe the problem and we will tell you what it probably is. No obligation.